NAME OF PROJECT CAPACITY
1     COMPREHENSIVE TREATMENT OF INDUSTRIAL SEWAGE    
2     PREVULCANIZED BUTYL RUBBER LINING TECHNOLOGY    
3     LIQUEFIED PETROLEUM GAS STORAGE STATION DESIGN    
4     SEPARATION AND RECOVERY OF THE "GASOLINE RESIDUE" FROM REFINERY    
5     PVC POLYMERIZED WN ANTISTICKING TECHNOLOGY    
6     MODERATE TEMPERATURE WASTE HEAT UTILIZATION TECHNOLOGY IN SULPHURIC ACID PRODUCTION    
7     TECHNOLOGY OF REACTION INJECTION MOULDING(RIM)    
8     THE DESIGN OF CS2 PRODUCTION UNIT BASED ON NATURAL GAS.    
9     PROCESS WATER QUALITY STABILIZATION TECHNOLOGY AND ITS ENGINEERING DESIGN    
10     ENGINEERING DESIGN FOR INDUSTRIAL AND DOMESTIC SEWAGE DISPOSAL    
11     HIGH-LEFT, LOW FLOURATE, MAZETYPE SCREW PUMP    
12     NEW FILM REDUCTION ADSORPTION HEAT-PUMP    
13     SERIAL PRODUCTS OF FREE BALL AUTOMATIC PUMPING GEAR